After
a fire the new building was commissioned to accomodate office, showroom,
factory and warehouse facilities within the total floor area of the
original and a limited budget. The factory to house sophisticated foam
cutting plant. The showroom to be spacious with good light. The site in an
older area of Penrose is contexturally grey. Existing site levels
determined a 2 level building with factory warehousing at the lower level
and an office/showroom above for direct street access and
visibility.
The
original footprint covered the whole site. The new is more compact with
direct benefits to the client of efficient site utilisation and a bonus
double height showroom.
Ron
Seeto B.Arch(Hons)